SPECS & CODES —
— PRODUCT SPECS.pdf
— TAPERED SPECS.pdf
— NP1 PREFERRED SEALANT SPECS.pdf
2010 Florida Building Code, Plumbing
904.1 Roof extension.
All open vent pipes that extend through a roof shall be terminated at least 6 inches (152 mm) above the roof and not less than 2 inches (51 mm) above the invert of the emergency overflow, except that where a roof is to be used for any purpose other than weather protection, the vent extensions shall be run at least 7 feet (2134 mm) above the roof.
2010 Florida Building Code, Residential
CHAPTER 25
PLUMBING ADMINISTRATION
P3103.1 Roof extension.
All open vent pipes which extend through a roof shall be terminated at least 6 inches (152 mm) above the roof except that where a roof is to be used for any purpose other than weather protection, the vent extensions shall be run at least 7 feet (2134 mm) above the roof.
International Plumbing Code (IPC)
The International Plumbing Code (IPC) requires plumbing vent pipes to extend vertically at least 152 mm (6 in.) above a roof, per Section 905.5, “Vent Connections and Grades.”
Additionally, vent pipes must be at least 305 mm (12 in.) away from a vertical surface. In
locations known for snow, the vent pipe needs to be at least 51 mm (2 in.) in diameter and 305 mm inside an insulated area of a building before extending through the roof. Vents in these locations also should extend 610 mm (24 in.) above a roof.

/////////////////////////
TUBOS, Inc.
P.O. Box 4663
Clearwater, FL 33758
Email: [email protected]
Phone: (727) 504-0633
Fax: (727) 213-6391

CONTACT ---